114The Cost Performance Index is computed as: A.budget cost of work performed divided by a

114 The Cost Performance Index is computed as:

A. budget cost of work performed divided by actual cost of work performed

B. budget cost of work performed minus actual cost of work performed

C. budget cost of work performed minus budget cost of work scheduled

D. budget cost of work scheduled divided by budget cost of work performed

E. actual cost of work scheduled divided by budget cost of work performed

点击查看答案

第2题

196The Cost Performance Index is computed as: A.budget cost of work performed divided by a

196 The Cost Performance Index is computed as:

A. budget cost of work performed divided by actual cost of work performed

B. budget cost of work performed minus actual cost of work performed

C. budget cost of work performed minus budget cost of work scheduled

D. budget cost of work scheduled divided by budget cost of work performed

E. actual cost of work scheduled divided by budget cost of work performed

点击查看答案

第3题

76The computation for Cost Performance Index is: A.BCWP/ACWP B.BCWP-ACWP C.BCWP-BCWS D.ACW

76 The computation for Cost Performance Index is:

A. BCWP/ACWP

B. BCWP-ACWP

C. BCWP-BCWS

D. ACWP/BCWP

E. ACWP-BCWS

点击查看答案

第4题

The Cost Performance Index (CPI) measuresA.total costsB.performance over a period of timeC

The Cost Performance Index (CPI) measures

A.total costs

B.performance over a period of time

C.costs at a point of time

D.variable costs

E.All of the above.

点击查看答案

第5题

110The Cost Performance Index (CPI) measures A.total costs B.performance over a period of

110 The Cost Performance Index (CPI) measures

A. total costs

B. performance over a period of time

C. costs at a point of time

D. variable costs

E. All of the above

点击查看答案

第6题

158The computation for Cost Performance Index is: A.BCWP/ACWP B.BCWP-ACWP C.BCWP-BCWS D.AC

158 The computation for Cost Performance Index is:

A. BCWP/ACWP

B. BCWP-ACWP

C. BCWP-BCWS

D. ACWP/BCWP

E. ACWP-BCWS

点击查看答案

第7题

Variance analysis include()

A.Schedule variance

B.Cost variance

C.The schedule performance index

D.The cost performance index

点击查看答案

第8题

The Cost Performance Index (CPI) measures:A.cost of work performed vs planned costs.B.work

The Cost Performance Index (CPI) measures:

A.cost of work performed vs planned costs.

B.work performed vs cost of work performed.

C.work performed vs planned work.

D.direct costs vs indirect costs.

E.floating costs vs. sunk costs.

点击查看答案

第9题

28The Cost Performance Index (CPI) measures A.total costs B.performance over a period of t

28 The Cost Performance Index (CPI) measures

A. total costs

B. performance over a period of time

C. costs at a point of time

D. variable costs

E. All of the above

点击查看答案

第10题

14Using the situation stated in the Special window, what is the cost performance index for

14 Using the situation stated in the Special window, what is the cost performance index for Case #9? A. 1.10

B. 1.91

C. 0.83

D. 1.20

E. None of the above

点击查看答案
热门考试 全部 >
相关试卷 全部 >
账号:
你好,尊敬的上学吧用户
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改
谢谢您的反馈

您认为本题答案有误,我们将认真、仔细核查,
如果您知道正确答案,欢迎您来纠错

警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“上学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

微信搜一搜
上学吧
点击打开微信
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反上学吧购买须知被冻结。您可在“上学吧”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
微信搜一搜
上学吧
点击打开微信