第1题

150The Cost Performance Index (CPI) measures: A.cost of work performed vs planned costs. B

150 The Cost Performance Index (CPI) measures:

A. cost of work performed vs planned costs.

B. work performed vs cost of work performed.

C. work performed vs planned work.

D. direct costs vs indirect costs.

E. floating costs vs. sunk costs

点击查看答案

第2题

68The Cost Performance Index (CPI) measures: A.cost of work performed vs planned costs. B.

68 The Cost Performance Index (CPI) measures:

A. cost of work performed vs planned costs.

B. work performed vs cost of work performed.

C. work performed vs planned work.

D. direct costs vs indirect costs.

E. floating costs vs. sunk costs.

点击查看答案

第3题

110The Cost Performance Index (CPI) measures A.total costs B.performance over a period of

110 The Cost Performance Index (CPI) measures

A. total costs

B. performance over a period of time

C. costs at a point of time

D. variable costs

E. All of the above

点击查看答案

第4题

28The Cost Performance Index (CPI) measures A.total costs B.performance over a period of t

28 The Cost Performance Index (CPI) measures

A. total costs

B. performance over a period of time

C. costs at a point of time

D. variable costs

E. All of the above

点击查看答案

第5题

The Cost Performance Index (CPI) measuresA.total costsB.performance over a period of timeC

The Cost Performance Index (CPI) measures

A.total costs

B.performance over a period of time

C.costs at a point of time

D.variable costs

E.All of the above.

点击查看答案

第6题

The cost performance index(CPI) is the ratio of earned value to () and can be used to esti
mate the projected cost of completing the project.

A.cost variance

B.planned cost

C.planned cost

D.actual cost

点击查看答案

第7题

Using the situation stated in the Special window, the cost performance index (CPI) for WBS

Using the situation stated in the Special window, the cost performance index (CPI) for WBS Element R is:

A . 0.875

B . 1.14

C . 0.952

D . 0.833

E . 1.2

点击查看答案

第8题

185Using the situation stated in the Special window, the cost performance index (CPI) for

185 Using the situation stated in the Special window, the cost performance index (CPI) for WBS Element R is:

A. 0.875

B. 1.14

C. 0.952

D. 0.833

E. 1.20

点击查看答案

第9题

103Using the situation stated in the Special window, the cost performance index (CPI) for

103 Using the situation stated in the Special window, the cost performance index (CPI) for WBS Element R is:

A. 0.875

B. 1.14

C. 0.952

D. 0.833

E. 1.20

点击查看答案

第10题

The earned value technique is a commonly used method of performance measurement.It integr
ates project scope,schedule,and cost measures to help the project management team assess project performance.If a project’s Cost Performance Index(CPI=EV/AC)value less than 1.0,it means that()。 A.the cost savings for work completed B.the project is ahead of its planned schedule C.the cost overrun for work completed D.1ess work was completed than was planned

点击查看答案
热门考试 全部 >
相关试卷 全部 >
账号:
你好,尊敬的上学吧用户
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改
谢谢您的反馈

您认为本题答案有误,我们将认真、仔细核查,
如果您知道正确答案,欢迎您来纠错

警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“上学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

微信搜一搜
上学吧
点击打开微信
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反上学吧购买须知被冻结。您可在“上学吧”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
微信搜一搜
上学吧
点击打开微信