第1题

You are working on an 18-month project with a small, co-located team . The project sponsor
and senior management are in another city and have requested weekly updates . The customer requires monthly meetings . Because the team members are busy with the pr

A.During project executing, you do not need to hold status meetings as long as you send the key stakeholders status report every week .

B.Once a month the entire team, including senior management, should meet with the customer . You should discuss the previous month's issues and the current status .

C.During project execution, it is only necessary for the project manager to meet with the customer once a month to fulfill your contractual obligation . Provide the customer with the status report and copy this report to key stakeholders .

D.The frequency and level of meeting as well as the format and type of information to be exchanged should be defined in the project's communications plan during planning .

点击查看答案

第2题

During your execution of the previous project, you had difficulties getting signoffs again
st the scope definition even though you delivered what the customer had specified. For the better execution for future projects,which process will you pay more atten

A.Performance Reporting。

B.Scope Verification。

C.Scope Definition。

D.Administrative Closure。

点击查看答案

第3题

The project life-cycle can be described as(72). A.project concept,project plannin9,proj

The project life-cycle can be described as(72). A.project concept,project plannin9,project execution,and project close-out B.project planning,work authorization,and project reporting C.project planning,project control,project definition,WBS development,and project termination D.project concept,project execution,and project reporting

点击查看答案

第4题

The project life-cycle can be described as:A.project concept, project planning, project ex

The project life-cycle can be described as:

A.project concept, project planning, project execution, and project close-out.

B.project planning, work authorization, and project reporting.

C.project planning, project control, project definition, WBS development, and project termination.

D.project concept, project execution, and project reporting.

E.All of the above.

点击查看答案

第5题

● The project life-cycle can be described as(72). (72)A.project concept, project planning,

● The project life-cycle can be described as(72).

(72)

A.project concept, project planning, project execution, and project close-out

B.project planning, work authorization, and project reporting

C.project planning, project control, project definition, WBS development, and project termination

D.project concept, project execution, and project reporting

点击查看答案

第6题

●The project life-cycle can be described as:Aproject concept, project planning, project ex

● The project life-cycle can be described as:

A project concept, project planning, project execution, and project close-out.

B project planning, work authorization, and project reporting.

C project planning, project control, project definition, WBS development, and project termination.

D project concept, project execution, and project reporting.

E All of the above.

点击查看答案

第7题

●During project execution, the customer authorizes and funds a scope change which requires

● During project execution, the customer authorizes and funds a scope change which requires a major change in the schedule. The baseline schedule:

A Now becomes the new schedule, including the changes, and the original baseline is disregarded.

B Is still the original baseline but annotated to reflect that a change has taken place.

C Is amended to reflect the scope change, but the original baseline is still maintained for post-project review.

D Is meaningless since every schedule update changes the baseline (i.e., a rubber baseline.)

E Is the same since baseline schedules cannot change once the development phase is completed.

点击查看答案

第8题

38During project execution, the customer authorizes and funds a scope change which require

38 During project execution, the customer authorizes and funds a scope change which requires a major change in the schedule. The baseline schedule:

A. Now becomes the new schedule, including the changes, and the original baseline is disregarded. B. Is still the original baseline but annotated to reflect that a change has taken place.

C. Is amended to reflect the scope change, but the original baseline is still maintained for post-project review.

D. Is meaningless since every schedule update changes the baseline (i.e., a rubber baseline.)

E. Is the same since baseline schedules cannot change once the development phase is completed

点击查看答案

第9题

The project life-cycle can be described as (72).A.project concept, project planning, proje

The project life-cycle can be described as (72).

A.project concept, project planning, project execution, and project close-out

B.project planning, work authorization, and project reporting

C.project planning, project control, project definition, WBS development, and project termination

D.project concept, project execution, and project reporting

点击查看答案

第10题

The project life-cycle can be described as(72). A.project concept,project plannin9,proj

The project life-cycle can be described as(72). A.project concept,project plannin9,project execution,and project close-out B.project planning,work authorization,and project reporting C.project planning,project control,project definition,WBS development,and project termination D.project concept,project execution,and project reporting

点击查看答案
热门考试 全部 >
相关试卷 全部 >
账号:
你好,尊敬的上学吧用户
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改
谢谢您的反馈

您认为本题答案有误,我们将认真、仔细核查,
如果您知道正确答案,欢迎您来纠错

警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“上学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

微信搜一搜
上学吧
点击打开微信
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反上学吧购买须知被冻结。您可在“上学吧”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
微信搜一搜
上学吧
点击打开微信