WAIS—RC数字广度分测验包括()。
A.顺背数字
B.倒背数字
C.顺背和倒背数字
D.视觉记数
A.顺背数字
B.倒背数字
C.顺背和倒背数字
D.视觉记数
第1题
A. All switch and bridge ports are in the forwarding state.
B. All switch and bridge ports are assigned as either root or designated ports.
C. All switch and bridge ports are in either the forwarding or blocking state.
D. All switch and bridge ports are either blocking or looping.
第2题
A. All switch and bridge ports are in the forwarding state.
B. All switch and bridge ports are in the stand-by state.
C. All switch and bridge ports are assigned as either root or designated ports.
D. All switch and bridge ports are in either the forwarding or blocking state.
E. All switch and bridge are either blocking or looping.
第3题
A.More collision domains will be created.
B.IP address utilization will be more efficient.
C.More bandwidth will be required than was needed previously.
D.An additional broadcast domain will be created.
第4题
A.The additions will create more collisions domains.
B.IP address utilization will be more efficient.
C.More bandwidth will be required than was needed previously.
D.An additional broadcast domain will be created.
E.The possibility that switching loops will occur will increase dramatically.
第5题
A.More collision domains will be created.
B.IP address utilization will be more efficient.
C.More bandwidth will be required than was needed previously.
D.An additional broadcast domain will be created.
第6题
A. The additions will create more collision domains.
B. IP address utilization will be more efficient.
C. More bandwidth will be required than was needed previously.
D. An additional broadcast domain will be created.
E. The possibility that switching loops will occur will increase dramatically.
第7题
A.Create an additional ACL to block the access to VLAN 1.
B.Move the management VLAN to something other than default.
C.Move all ports to another VLAN and deactivate the default VLAN.
D.Limit the access in the switch using port security configuration.
E.Use static VLAN in trunks and access ports to restrict connections.
F.Shutdown all unused ports in the Catalyst switch.
第8题
A. Create an additional ACL to block the access to VLAN 1.
B. Move the management VLAN to something other than default.
C. Move all ports to another VLAN and deactivate the default VLAN.
D. Limit the access in the switch using port security configuration.
E. Use static VLAN in trunks and access ports to restrict connections.
F. Shutdown all unused ports in the Catalyst switch.
第9题
A.Ensure that the Ethernet encapsulations match on the interconnected router and switch ports.
B.Ensure that cables A and B are straight-through cables.
C.Ensure cable A is plugged into a trunk port.
D.Ensure the switch has power.
E.Reboot all of the devices.
F.Reseat all cables.
第10题
A.Host B and the switch need to be in the same subnet.
B.The switch needs and appropriate default gateway assigned.
C.The switch interface connected to the router is down.
D.Host B need to be assigned an IP address in vlan 1.
E.The switch interfaces need the appropriate IP addresses assigned.
为了保护您的账号安全,请在“上学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!