项目实施期间,一名团队成员告诉你,发生了一项已识别的重要风险。但影响并没有比之前预算的严重。你首先应该做什么?

A.增加质量标准。

B.将这个发现告诉团队成员,让他们核实这位团队成员的发现。

C.研究变更应急计划。

D.通知管理层。

查看答案
如搜索结果不匹配,请 联系老师 获取答案
您可能会需要:
您的账号:,可能会需要:
您的账号:
发送账号密码至手机
发送
更多“项目实施期间,一名团队成员告诉你,发生了一项已识别的重要风险…”相关的问题

第1题

你刚刚完成一个系统集成项目的大部分工作。供应商找到你并拿出一个详细的合同收尾程序。但是合同

中已经规定了合同收尾程序,作为项目经理的你应该怎么做?

A.获得管理层批准后收尾程序

B.获得一个变更单

C.建立一个更加完整的程序

D.评估供应商新的详细程序的质量,如果好于现在的程序,就予以采纳。

点击查看答案

第2题

Management by exception involves all of the following except:A.determining deviation

Management by exception involves all of the following except:

A.determining deviation from plan.

B.setting acceptable variance ranges.

C.alerting management to everything except those items specifically "excepted" within the Management Plan.

D.alerting management to only the items that are outside acceptable variance.

点击查看答案

第3题

Management by objectives of a works only if:A.it is supported by management.B.the rules

Management by objectives of a works only if:

A.it is supported by management.

B.the rules are written down.

C.the project does not impact the objectives.

D.the project includes the objectives in the charter.

点击查看答案

第4题

Which of the following statements is true?A.Properly operated projects often go through

Which of the following statements is true?

A.Properly operated projects often go through progressive elaboration, not remaining fixed even though the scope has been defined and agreed.

B.The project to create the Shanxia (Three-Gorges ) Dam can't be considered temporary because of the operations such as power generation , transformation of electric power , transportation , etc . are following after the Dam has been completed.

C.Projects can go on indefinitely when there is support and maintenance involved.

D.Projects are not unique because there is always some aspect that has been done before.

点击查看答案

第5题

Which of the followings are not included in the main Project Management processes?

A.Feasibility

B.Executing

C.Planning

D.Closing

点击查看答案

第6题

In comparing the Project Management Life Cycle and the Product Life Cycle, which of

the followings is most true?

A.The project life cycle typically changes and evolves with the project.

B.The project management life cycle is unique to every project.

C.The project life cycle is can be referred to as the Project Management Life Cycle.

D.The product life cycle typically involves more than one project life cycle.

点击查看答案

第7题

质量保证除为项目提供支持外,还为什么创造了条件?A.计划一实施一检查—行动B.持续的过程改进C.

质量保证除为项目提供支持外,还为什么创造了条件?

A.计划一实施一检查—行动

B.持续的过程改进

C.项目管理成熟度

D.工作绩效信息

点击查看答案

第8题

你担任新项目的项目经理,该项目旨在提高发开铁路岔道转接站的整体易用性。你已决定增加一名专家

,此人专攻适用于团队的工作环境改造学。她决定观察你和团队成员的工作方法,以确定新系统的要求。这种方法也称做()。

A.监视

B.教练

C.工作跟踪

D.用户实验法

点击查看答案

第9题

绩效测量基准不包括哪项内容?A.范围基准B.质量基准C.进度基准D.成本基准

绩效测量基准不包括哪项内容?

A.范围基准

B.质量基准

C.进度基准

D.成本基准

点击查看答案

第10题

尽管项目章程的作用是陈述项目经理在项目中的职权和职责,但为成为有效的领导者,项目经理进一步

要求具备以下哪类权力?

A.专家权力

B.法定权力

C.职位权力

D.参照权力

点击查看答案
热门考试 全部 >
相关试卷 全部 >
账号:
你好,尊敬的上学吧用户
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改
谢谢您的反馈

您认为本题答案有误,我们将认真、仔细核查,
如果您知道正确答案,欢迎您来纠错

警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“上学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

微信搜一搜
上学吧
点击打开微信
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反上学吧购买须知被冻结。您可在“上学吧”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
微信搜一搜
上学吧
点击打开微信