题目内容
(请给出正确答案)
[主观题]
27Risks that cannot be identified or evaluated _____ . A.should be deflected to the contra
27 Risks that cannot be identified or evaluated _____ .
A. should be deflected to the contracting officer.
B. should be handled via contingency allowances.
C. should be ignored, since they cannot be identified.
D. should be ignored, since they are not covered in the Risk Assessment.
E. C and D
如搜索结果不匹配,请 联系老师 获取答案