第1题

7Which of the following types of contracts is equivalent to a cost plus contract: A.Fixed

7 Which of the following types of contracts is equivalent to a cost plus contract:

A. Fixed firm price

B. Cost reimbursable

C. Fixed price plus incentive fee

D. progress payments

E. All of the above

点击查看答案

第2题

Which of the following types of contracts is equivalent to a cost plus contract:AFixed fir

Which of the following types of contracts is equivalent to a cost plus contract:

A Fixed firm price

B Cost reimbursable

C Fixed price plus incentive fee

D progress payments

E All of the above.

点击查看答案

第3题

133Which of the following types of contracts allows the owner to transfer risk to the cont

133 Which of the following types of contracts allows the owner to transfer risk to the contractor:

A. cost plus incentive fee

B. cost sharing

C. firm fixed price

D. cost plus fixed fee

E. performance guarantees

点击查看答案

第4题

51Which of the following types of contracts allows the owner to transfer risk to the contr

51 Which of the following types of contracts allows the owner to transfer risk to the contractor:

A. cost plus incentive fee

B. cost sharing

C. firm fixed price

D. cost plus fixed fee

E. performance guarantees

点击查看答案

第5题

124In which of the following types of contracts is it most important for the contractor to

124 In which of the following types of contracts is it most important for the contractor to maintain control of cost, schedule and scope changes.

A. unit price

B. cost plus incentive fee

C. cost plus fixed fee

D. firm fixed price

E. B and D only

点击查看答案

第6题

42In which of the following types of contracts is it most important for the contractor to

42 In which of the following types of contracts is it most important for the contractor to maintain control of cost, schedule and scope changes.

A. unit price

B. cost plus incentive fee

C. cost plus fixed fee

D. firm fixed price

E.B and D only

点击查看答案

第7题

With regards to prices and costs, the types of construction contracts do not include .

A、Unit price Contracts

B、Lump-sum Contracts

C、Cost/reimbursement Contracts

D、Turnkey Contracts

点击查看答案

第8题

Which ones of the following are the types of interest rate derivative used to hedge interest rate risk?

A、Futures contracts

B、Interest rate swaps

C、Interest rate options

D、Caps, collars and floors

点击查看答案

第9题

Types of contracts are virtually classified by their______system: (1) price-based and
Types of contracts are virtually classified by their______system: (1) price-based and

(2) cost-based.

A、construction

B、design

C、tender

D、payment

点击查看答案

第10题

Which of the following types of contracts allows the owner to transfer risk to the contrac
tor:

A cost plus incentive fee

B cost sharing

C firm fixed price

D cost plus fixed fee

E performance guarantees

点击查看答案
热门考试 全部 >
相关试卷 全部 >
账号:
你好,尊敬的上学吧用户
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改
谢谢您的反馈

您认为本题答案有误,我们将认真、仔细核查,
如果您知道正确答案,欢迎您来纠错

警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“上学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

微信搜一搜
上学吧
点击打开微信
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反上学吧购买须知被冻结。您可在“上学吧”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
微信搜一搜
上学吧
点击打开微信