题目内容 (请给出正确答案)
[多选题]

计算砌体工程量时,关于外墙墙高说法不正确的是()。

A.坡屋面无檐口天篷者,算至屋面板底

B.有屋架,且室内外均有天篷者,其高度算至屋架下弦底面另加100mm

C.有屋架无天篷者,其高度算至屋架下弦底另加300mm

D.出檐宽度超过300mm时,应按实砌高度计算

E.平屋顶墙高算至钢筋混凝土板底面

查看答案
如搜索结果不匹配,请 联系老师 获取答案
您可能会需要:
您的账号:,可能会需要:
您的账号:
发送账号密码至手机
发送
更多“计算砌体工程量时,关于外墙墙高说法不正确的是()。A.坡屋面…”相关的问题

第1题

196Giving a part of project work to a contractor is an example of: A.risk mitigation B.ris

196 Giving a part of project work to a contractor is an example of:

A. risk mitigation

B. risk assignment

C. risk delegation

D. risk deflection

E. risk assumption

点击查看答案

第2题

78Giving a part of project work to a contractor is an example of: A.risk mitigation B.risk

78 Giving a part of project work to a contractor is an example of:

A. risk mitigation

B. risk assignment

C. risk delegation

D. risk deflection

E. risk assumption

点击查看答案

第3题

The contractual statement of work (CSOW)A.Must be the same as the proposal statement of wo

The contractual statement of work (CSOW)

A.Must be the same as the proposal statement of work

B.Does not identify reporting requirements

C.Can be at a different level of detail (i.e. WBS level) than the proposal statement of work

D.Identifies the contractor's organizational structure for the project

E.All of the above

点击查看答案

第4题

The customer on a project tells the project manager he has run out of money to pay for the
project . What should the project manager do FIRST ?

A.Shift more of the work to later in the schedule to allow time for the customer to get the funds .

B.Reduce the scope of work and enter closure .

C.Stop work .

D.Release part of the project team .

点击查看答案

第5题

Which of the following type of contracts is most preferable to the contractor doing the pr
oject work?

A.Cost plus fixed fee

B.Fixed price

C.Fixed price plus incentive fee

D.B and C

点击查看答案

第6题

●The contractual statement of work (CSOW)AMust be the same as the proposal statement of wo

● The contractual statement of work (CSOW)

A Must be the same as the proposal statement of work

B Does not identify reporting requirements

C Can be at a different level of detail (i.e. WBS level) than the proposal statement of work

D Identifies the contractor's organizational structure for the project

E All of the above

点击查看答案

第7题

with a clear SOW a contractor completes work as specified,but the buyer is not pleased wit
h the result.the contract is considered to be ()

A.incomplete because the buyer is not pleased

B.incomplete because the specs are incorrect

C.compete because the contractor meets the terms and conditions of the contract

D.complete because the contractor is satisfied

点击查看答案

第8题

86The contractual statement of work (CSOW) A.Must be the same as the proposal statement of

86 The contractual statement of work (CSOW)

A. Must be the same as the proposal statement of work

B. Does not identify reporting requirements

C. Can be at a different level of detail (i.e. WBS level) than the proposal statement of work

D. Identifies the contractor's organizational structure for the project

E. All of the above

点击查看答案

第9题

168The contractual statement of work (CSOW) A.Must be the same as the proposal statement o

168 The contractual statement of work (CSOW)

A. Must be the same as the proposal statement of work

B. Does not identify reporting requirements

C. Can be at a different level of detail (i.e. WBS level) than the proposal statement of work

D. Identifies the contractor's organizational structure for the project

E. All of the above

点击查看答案
热门考试 全部 >
相关试卷 全部 >
账号:
你好,尊敬的上学吧用户
发送账号至手机
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改
谢谢您的反馈

您认为本题答案有误,我们将认真、仔细核查,
如果您知道正确答案,欢迎您来纠错

警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“上学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

微信搜一搜
上学吧
点击打开微信
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反上学吧购买须知被冻结。您可在“上学吧”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
微信搜一搜
上学吧
点击打开微信