Project schedule management is made up of six management processes including: activity definition, activity sequencing()and schedule control by order.

A.activity duration estimating, schedule developing, activity resource estimating

B.activity resource estimating, activity duration estimating, schedule development

C.schedule developing, activity resource estimating, activity duration estimating

D.activity resource estimating, schedule developing, activity duration estimating

点击查看答案

第2题

●The extent of project management techniques to be used on a project are determined mainly

● The extent of project management techniques to be used on a project are determined mainly by the _____ and _____ of the project.

A budget, schedule

B quality requirements, schedule

C size, type of industry

D nature, size

E project manager, sponsor

点击查看答案

第3题

The schedule management plan is a component of the project management plan The schedule
management plan may be formal or informal, highly detailed or broadly framed, based upon the()of the project, and includes appropriate control thresholds.

A.goals

B.values

C.needs

D.Level

点击查看答案

第4题

69The extent of project management techniques to be used on a project are determined mainl

69 The extent of project management techniques to be used on a project are determined mainly by the _____ and _____ of the project.

A. budget, schedule

B. quality requirements, schedule

C. size, type of industry

D. nature, size

E. project manager, sponsor

点击查看答案

第5题

151The extent of project management techniques to be used on a project are determined main

151 The extent of project management techniques to be used on a project are determined mainly by the _____ and _____ of the project.

A. budget, schedule

B. quality requirements, schedule

C. size, type of industry

D. nature, size

E. project manager, sponsor

点击查看答案

第6题

The extent of project management techniques to be used on a project are determined mainly
by the _____ and _____ of the project.

A . budget, schedule

B . quality requirements, schedule

C . size, type of industry

D . nature, size

E . project manager, sponsor

点击查看答案

第7题

The project manager is responsible for a system integration project.Which documents are re
quired to perform quality assurance on the project?

A.Quality metrics,work performance information,project management plan.

B.Project management plan,lessons learned,scope statement.

C.Cost performance baseline,project management plan,schedule performance index.

D.Project management plan,bariance analysis,risk register.

点击查看答案

第8题

● The project schedule is more than a document that lays out the activities over time to r
epresent the time dimension of the project, it is a management tool to be used for decision making. As such, the schedule is used by the project management team to (73) .

(73)

A. measure, delay, record, distribute, analyze, and direct

B. plan, schedule, monitor, control, report, and forecast

C. promote, highlight, monitor, control, forecast, and report

D. emphasize, visualize, analyze, conceptualize, report, and record

点击查看答案

第9题

The project wants to build a long channel with 12 kilometers.The project budget is 1 milli
on,it is expected to build 100 meters of runway.The senior management requires the project manager to use earned value management(EVM)monthly to promoters report state.After six months,the project has completed the 600 meters channel,and has been spending US$600,000.What should the project manager report to the project sponsor?

AThe project’s cost performance index of 0.83 and a schedule index of 1,The project will be completed on time,but may exceed the budget.

B..The project’s cost performance index of 0.6 and a schedule performance index of 1.according to the S-curve,the project may be complete on time and on budget.

C..The work is progressing well.It has spent US$600,000,and is expected value of US$600,000,and it is expected to be^^completed on time.

D.The work is progressing well,but the project will likely be over budget.There is insuflicient infermations to create a budget using EVM.

点击查看答案

第10题

● The earned value technique is a commonly used method of performance measurement. It inte
grates project scope, cost, and schedule measures to help the project management team assess project performance. If a project’s Schedule Performance Index(SPI=EV/PV) value less than 1.0, it means that __(74)__.

(74)A.the project is ahead of its planned schedule

B.less work was completed than was planned

C.the cost overrun for work completed

D.the cost under-run of performance to date

点击查看答案
热门考试 全部 >
相关试卷 全部 >
账号:
你好,尊敬的上学吧用户
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改
谢谢您的反馈

您认为本题答案有误,我们将认真、仔细核查,
如果您知道正确答案,欢迎您来纠错

警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“上学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

微信搜一搜
上学吧
点击打开微信
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反上学吧购买须知被冻结。您可在“上学吧”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
微信搜一搜
上学吧
点击打开微信