固定总价合同适用的条件一般为()。
A.工程项目的施工图设计符合要求,项目范围及工程量计算依据确切,无较大的设计变更,报价工程量与实际完成工程量无较大差异
B.规模较小、技术不太复杂的中小型工程,承包方可以合理预见实施过程中遇到的各种风险
C.合同工期较短(一般为一年内工程)
D.初步设计符合要求,项目范围确切的工程
E.工程的合同工期合理
![](https://lstatic.shangxueba.com/sxbzda/h5/images/tips_org.png)
A.工程项目的施工图设计符合要求,项目范围及工程量计算依据确切,无较大的设计变更,报价工程量与实际完成工程量无较大差异
B.规模较小、技术不太复杂的中小型工程,承包方可以合理预见实施过程中遇到的各种风险
C.合同工期较短(一般为一年内工程)
D.初步设计符合要求,项目范围确切的工程
E.工程的合同工期合理
第1题
A、who of them should I elect
B、who of them I should elect
C、which of them should I elect
D、which of them I should elect
第3题
Which method should be used to warm up the pump turbines prior to discharge ________.
A.Lock the turbine rotor and slowly bleed in steam until operating temperature is reached
B.Run the pump at high speed with the discharge valves closed
C.Run the turbine at slow speed with the pump disconnected
D.Shut the discharge valve and run the pump at slow speed
第4题
A.Migration
B.Preservation
C.New and Complete Overwrite
D.Alternate disk installation
第5题
A、WACC method
B、APV method
C、FTE method
D、All of the above are used in capital budgeting decisions.
第6题
A.Berlitz Method
B.the U. S Method
C.Oral Method
D.Concrete Method
第7题
Which condition cannot be used to calculate the integration constants when the integration method is used to determine the deflection curve equation?
A、
B、
C、
D、
第8题
A.savevg
B.tar
C.cpio
D.mksysb
第9题
A、A by product is a product produced at eh sames time as other products which has a relatively low volume compared with the other products.
B、Since a by product is a saleable item it should be separately costed in the process account, and should absorb some of the process costs.
C、Costs incurred prior to the point of separation are known as the common or joint costs.
D、The relative sales value method is the most widely used method of apportioning joint costs.
第10题
A、job classification method
B、job grading method
C、ranking method
D、point method