题目内容 (请给出正确答案)
[主观题]

企业因销售商品向购货单位收取的下列款项中,应在“应收账款”科目核算的有()。

企业因销售商品向购货单位收取的下列款项中,应在“应收账款”科目核算的有()。 此题为多项选择题。请帮

查看答案
如搜索结果不匹配,请 联系老师 获取答案
您可能会需要:
您的账号:,可能会需要:
您的账号:
发送账号密码至手机
发送
更多“企业因销售商品向购货单位收取的下列款项中,应在“应收账款”科…”相关的问题

第1题

The key purpose of project control is to:A.Plan ahead for uncertainties.B.Generate status

The key purpose of project control is to:

A.Plan ahead for uncertainties.

B.Generate status reports.

C.Keep the project on track.

D.Develop the project road map.

E.All of the above.

点击查看答案

第2题

88The key purpose of project control is to: A.Plan ahead for uncertainties. B.Generate sta

88 The key purpose of project control is to:

A. Plan ahead for uncertainties.

B. Generate status reports.

C. Keep the project on track.

D. Develop the project road map.

E. All of the above.

点击查看答案

第3题

170The key purpose of project control is to: A.Plan ahead for uncertainties. B.Generate st

170 The key purpose of project control is to:

A. Plan ahead for uncertainties.

B. Generate status reports.

C. Keep the project on track.

D. Develop the project road map.

E. All of the above

点击查看答案

第4题

●The purpose of configuration management is to:Ainsure drawings are updatedBcontrol change

● The purpose of configuration management is to:

A insure drawings are updated

B control change throughout the project

C control change during the production only

D generate engineering change proposals

E inform. the project manager of changes

点击查看答案

第5题

115The purpose of configuration management is to: A.insure drawings are updated B.control

115 The purpose of configuration management is to:

A. insure drawings are updated

B. control change throughout the project

C. control change during the production only

D. generate engineering change proposals

E. inform. the project manager of changes

点击查看答案

第6题

33The purpose of configuration management is to: A.insure drawings are updated B.control c

33 The purpose of configuration management is to:

A. insure drawings are updated

B. control change throughout the project

C. control change during the production only

D. generate engineering change proposals

E. inform. the project manager of changes

点击查看答案

第7题

What is the purpose of the project?A.To protect areas with high biodiversity.B.To help con

What is the purpose of the project?

A.To protect areas with high biodiversity.

B.To help control environmental pollution.

C.To rescue endangered living species.

D.To avoid global warming.

点击查看答案

第8题

What is the purpose of me project?A.To protect areas with high biodiversity.B.To help cont

What is the purpose of me project?

A.To protect areas with high biodiversity.

B.To help control environmental pollution.

C.To rescue endangered living species.

D.To avoid global warming.

点击查看答案

第9题

Much of the effort cost control involves analyzing the relationship between the consumption of project funds and the work being accomplished for such expenditures . The key to effective cost control i

A、 Schedule baseline

B、 Cost baseline

C、 Cost output

D、 Cost input

点击查看答案

第10题

What's the purpose of this passage?A.To introduce the main purpose of the project to the r

What's the purpose of this passage?

A.To introduce the main purpose of the project to the readers

B.To express the author's opposition to the project

C.To appeal to the public to fight against the project

D.To inform. the readers of the controversy over the project

点击查看答案
热门考试 全部 >
相关试卷 全部 >
账号:
你好,尊敬的上学吧用户
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改
谢谢您的反馈

您认为本题答案有误,我们将认真、仔细核查,
如果您知道正确答案,欢迎您来纠错

警告:系统检测到您的账号存在安全风险

为了保护您的账号安全,请在“上学吧”公众号进行验证,点击“官网服务”-“账号验证”后输入验证码“”完成验证,验证成功后方可继续查看答案!

微信搜一搜
上学吧
点击打开微信
警告:系统检测到您的账号存在安全风险
抱歉,您的账号因涉嫌违反上学吧购买须知被冻结。您可在“上学吧”微信公众号中的“官网服务”-“账号解封申请”申请解封,或联系客服
微信搜一搜
上学吧
点击打开微信